Dalian Jinshitan Hospital PET/CT Application Project Completion Environmental Protection Acceptance Self-Inspection and Self-Check Report

2020-04-17

Attachment 1:

 

Dalian Jinshitan Hospital Document

 

Da Jin doctor character [ 2019 ] 12 Number

                                                                

 

Dalian Jinshitan Hospital PET/CT Application Project

Completion Environmental Protection Acceptance Self-Inspection and Self-Check Report

 

One, Basic Information on Dalian Jinshitan Hospital and Overview of the Project Construction

Dalian Jinshitan Hospital is located in a national... Located in the prime area of a 5A-level tourism and vacation resort, this facility was constructed in 2002. It boasts a beautiful natural environment and convenient transportation access. With a total construction area of 38,000 square meters, it offers 500 beds, including 200 VIP and foreign guest beds. As a comprehensive second-level hospital equipped with advanced facilities and offering a full range of medical services—including prevention, diagnosis, rehabilitation, and health care—it is the only large-scale medical institution in the Jinshitan area. The hospital also features a 500-square-meter health check-up center.

In February 2017, Dalian Jinshitan Hospital commissioned Liaoning Fujie Environmental Protection Technology Consulting Co., Ltd. to complete the radiation environmental impact assessment for the PET/CT application project at Dalian Jinshitan Hospital. On May 10, 2017, the project obtained approval from the Liaoning Provincial Department of Environmental Protection through the environmental impact assessment review (Liao Huan Shen Biao [2017] No. 27).

This project is at 2017 Year 5 Start construction in the month, 2017 Year 11 Completion is scheduled for this month. This project is being constructed strictly in accordance with the drawings approved in the environmental impact assessment. , the main project was completed in 20 18 Year 4 The facility is undergoing trial operation, and the corresponding environmental protection and environmental risk prevention facilities and measures have been put into use simultaneously.

Dalian Jinshitan Hospital Construction Set of the The PET/CT scanning room is located in the southeast corner of the first floor of the outpatient building and is affiliated with the Department of Nuclear Medicine. To the east of the scanning room are the control room and the waiting area; to the south is a corridor. Before the renovation, this space served as an X-ray room and an archive room. On the basement level below the PET/CT scanning room are the decay pool and the storage room.

The workspace has an independent work area with clear demarcation lines from surrounding departments, and the layout of the workspace is reasonable.

II. Implementation Status of Environmental Impact Assessment Approvals

1 The hospital has established various radiation protection systems, job-specific work procedures, and emergency response plans for accidents.

2 The construction and operation of radiation workplaces—including various functional rooms in the Department of Nuclear Medicine and decay pools—have all been carried out in accordance with environmental impact assessment requirements and meet the necessary protection standards.

3 The PET/CT workplace is equipped with radiation dose monitoring instruments, radiation... Work Personnel are equipped with personal dosimeters and protective gear; equipment and protective devices undergo regular inspection and maintenance to ensure radiation safety in the workplace. Standardized signage is prominently displayed at radiation work areas. “Caution: Ionizing Radiation” warning sign.

4 The Department of Nuclear Medicine has implemented clear zoning to prevent unauthorized personnel from entering the controlled area (high-radioactivity zone) and the supervised area (low-radioactivity zone) at will. No unrelated items are allowed to be stored in these areas, and reasonable entry and exit channels have been established for both patients and medical staff.

5、 Solid waste has been collected in medical waste containers, labeled with the date, and stored in the solid waste storage facility. After ten half-lives have elapsed, it will be disposed of as ordinary waste.

6. The decay pool has been completed according to the requirements of the environmental impact assessment, and its volume is sufficient to accommodate radioactive wastewater storage. 10 half-lives.

III. Future Work Plans:

1. Regularly inspect various pollution prevention and control measures to ensure their effective operation.

2. The hospital is strengthening. Nuclear Medicine Department Manage and maintain the equipment to ensure it remains in good working condition. Promptly submit applications for equipment upgrades and promptly complete the required environmental protection procedures.

3. Strictly enforce environmental protection. The “Three Simultaneities” system ensures that all pollution prevention and control measures are effectively implemented.

 

Dalian Jinshitan Hospital

2019 8 Moon 1 day

Attachment 2:

Attachment 3:

 

Dalian Jinshitan Hospital PET/CT Environmental Protection Upon Completion of the Application Project

Acceptance Monitoring Report Form

(For Approval)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Construction Unit: Dalian Jinshitan Hospital

Prepared by: Liaoning Heyuan Environmental Technology Consulting Service Co., Ltd.

March 2020

 

 

Legal Representative of the Construction Unit: Dai Jingjie

 

Legal Representative of the Preparing Entity: Jiang He

 

Project Leader: Liu Ming

 

Applicant: Zhang Enfu

 

 

 

 

 

 

 

 

 

 

Construction Unit: Dalian Jinshitan Hospital (Seal)

Phone: 13840971137

Fax: /

Postal code: 116650

Address: Qingshi Road, Jinshitan Tourist Resort, Dalian 99 Number

 

 

 

Prepared by: Liaoning Huyuan Environmental Technology Consulting Co., Ltd. (Seal)

Phone: 13624039966

Fax: /

Postal code: 110000

Address: Huanghe South Street, Huanggu District, Shenyang City 96-6 Number

 

Table 1

Project Name

Dalian Jinshitan Hospital PET/CT Application Project

 

 

 

 

 

 

 

 

 

 

 

Name of the construction entity

 

 

Dalian Jinshitan Hospital

 

 

 

 

 

 

 

 

 

 

 

 

Nature of the construction project

 

 

New construction, expansion and renovation, technological upgrading, relocation

 

 

 

 

 

 

 

 

 

 

Construction site

Qingshi Road, Dalian Jinshitan Tourism and Resort Area 99 Number

 

 

 

 

 

 

 

 

 

 

 

Main product name

 

 

/

 

 

 

 

 

 

 

 

 

 

 

Design capability

Radiation device: PET/CT ( 1 Taiwan); Applications of Radioisotopes: 18 F

 

Actual ability

Radiation device: PET/CT ( 1 Taiwan); Applications of Radioisotopes: 18 F

 

Environmental Impact Assessment Time for Construction Projects

2017 Year 5 Moon 10 day

 

Construction commencement time

2017 Year 5 Moon 20 day

 

 

 

 

 

 

 

Debugging time

2018 Year 5 Moon 28 day

 

Acceptance site monitoring time

2019 Year 9 Moon 24 day

 

 

 

 

 

 

 

Environmental Impact Assessment Report

Liaoning Provincial Department of Environmental Protection

 

Environmental Impact Assessment Report

Liaoning Fujie Environmental Protection Technology Consulting

Approval Department

 

Preparation Unit

 

Limited Liability Company

 

 

 

 

 

 

 

 

 

 

 

 

Environmental Protection Facility Design Unit

Shenyang Zheng Wei'an Technical Protection

 

Environmental Protection Facility Construction Unit

Shenyang Zheng Wei An Ji Protective Co., Ltd.

Limited Liability Company

 

 

Company

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Total estimated investment (ten thousand yuan)

2000

 

Total Estimated Environmental Protection Investment (in 10,000 yuan)

10.7

Proportion

 

0.54%

 

 

 

 

 

 

 

 

Actual Total Budget (in 10,000 yuan)

1700

 

Environmental Protection Investment (ten thousand yuan)

17.01

Proportion

 

1.00%

 

 

 

 

 

 

 

( 1 ) The Environmental Protection Law of the People’s Republic of China (Presidential Order No. 9, 2015 Year 1 Moon 1

 

Effective from the date of issuance, 2017 Annual revision);

 

 

 

 

 

( 2 ) The Environmental Impact Assessment Law of the People’s Republic of China (Presidential Order No. 48, 2016

 

Year 9 Moon 1 Effective from the date of promulgation);

 

 

 

 

 

( 3 ) The Law of the People’s Republic of China on the Prevention and Control of Radioactive Pollution (Presidential Order No. 6, 2003 Year

 

10 Moon 1 Effective from the date of promulgation);

 

 

 

 

 

 

( 4 ) Decision on Amending the “Regulations on Environmental Protection Management of Construction Projects” (State Council Order No. [number]) 682

Acceptance Monitoring Basis

Number, 2017 Year 10 Moon 1 Effective from the date of promulgation);

 

 

 

 

 

( 5 ) “On Amending” < Catalog of Categorized Management for Environmental Impact Assessment of Construction Projects > The decision on part of the content

 

Regulation (Ministry of Ecology and Environment Order No. [number]) 1 Number, 2018 Year 4 Moon 28 Effective from the date of promulgation);

 

 

( 6 ) Regulations on the Safety and Protection of Radioisotopes and Radiation Devices (State Council Order No. [number]) 449

 

Number, 2019 Annual revision);

 

 

 

 

 

 

( 7 ) Decision on Amending the “Administrative Measures for Safety Licensing of Radioisotopes and Radiation Devices”

 

Regulation (Ministry of Environmental Protection Order No. [number]) 3 Number, 2017 Year 12 Moon 12 Second revision on the same day);

 

( 8 ) Announcement on the Publication of “Classification of Radiation Devices” (Ministry of Environmental Protection, National Health and Family Planning Commission)

 

 

 

 

 

 

 

 